San Diego International Airport Terminal 2 Parking Plaza
Project Location
San Diego, CA
Owner
San Diego County Regional Airport Authority
Architect
Watry Design and Gensler
Market
Aviation
Services
General Contracting
Region
Southern California
Swinerton Office Location
San Diego, California
Keywords
Concrete Construction, Design-Build Delivery, Utilities and Offsite Improvements Including Road & Intersection Improvements, Phased Construction
A design-build project, the new 3-level, 2,700-stall, cast-in-place Parking Plaza encompasses 920,000 square feet. It now serves as one of the main gateways to the airport, creating a welcoming experience for travelers as they arrive. It features state-of-the-art technology to simplify the passenger experience, including a Parking Guidance System and a License Plate Recognition System. The design features active and passive safety features, along with local art that doubles as wayfinding cues. Work also included offsite improvements, including parking lot reconfigurations, utility relocations, and connection into the existing airport. The Parking Plaza is extremely energy efficient and has earned multiple sustainability awards from the industry. Swinerton self-performed the entire concrete scope of work.